Blue River Run
NOTICES PAGE
Note that some documents are password protected. This practice has changed and newly posted documents are not password protected. If you attempt to open a document that is protected, type in the password "trout".
June
20, 2007
REVISED
Staining Notice
******************************************
*****************************************
October 10 , 2005
Remember to turn on heat tapes.
If you have heat tape on your roof, remember to turn it on for the winter. The heat tape on a dedicated breaker on your electrical panel. If the breaker is not labeled or you need other assistance, please contact Davel, your property manager, at 970 468-6025.
*************************************************************************************
TOWNHOME STAINING UPDATE, MAY 2005
A
total of 68 ballots were returned with the following results:
34 votes for
Solid, single color
21 votes for Solid, multi-color
13 votes for leaving
As Is
The staining will be done in a single, solid stain in a color that has
been specially matched, as closely as possible, to the existng siding color. The
project will begin again on June 6, 2005, weather permitting. The two buildings
that were stained in the multi-color schemes will be restained to match the other
buildings.
NOTE:
The staining
project has been delayed until the end of June because of scheduling delays due
to our cold/wet weather here in the mountains.
*************************************************************************************
TOWNHOME STAINING
Links to the Staining Schedule, the revised color board and the ballot are listed below. (Note: the ballot is on page 2, following Mr. Thayer's letter)
At the 2004 Annual Meeting, the members in attendance, with proxies voted, agreed to begin using a solid stain material, rather than a clear or semi-transparent product on the Townhomes on Creek Lane and Mountain Vista. This decision was based on economics; for example, the clear or semi-transparent product must be applied every two - three years to avoid damage to the wood siding and the solid stain product can be applied every eight - nine years. It was also agreed to and voted upon to follow the decision of the designer regarding color schemes and the placement of the schemes. The staining project began late last summer on Creek Lane and was halted after completion of two buildings due to weather.
Upon completion of these two buildings, the designer reviewed the colors and determined that the colors were not what she had anticipated. She has revised the color schemes and she plans to have those two buildings re-stained, at her expense, in the spring.
The
link below, "Revised Paint Schedule", from Summit Legacy Designs lists
the colors to be used. Also below is a link to the color board. The color board
is a representation of the color schemes; however, due to photography and web
posting, the depth of the colors has been compromised. These are standard Sherwin
Williams "Woodscapes" colors and you are encouraged to visit a Sherwin
Williams store with the revised paint schedule to see a more accurate color representation.
The application of the schemes is as follows:
|
SCHEME I | SCHEME II |
SCHEME III |
| 101 - 107 Creek Lane | 109 - 115 Creek Lane | 117 - 123 Creek Lane |
| 125 - 131 Creek Lane | 133 - 139 Creek Lane | 124 - 130 Creek Lane |
| 108 - 114 Creek Lane | 116 - 122 Creek Lane | 100 - 106 Creek Lane |
| 101 - 107 Mountain Vista | 111 - 117 Mountain Vista | 121 - 127 Mountain Vista |
| 110 - 116 Mountain Vista | 120 - 126 Mountain Vista | 100 - 106 Mountain Vista |
Summit Legacy Designs Paint Revised Schedule
**********************************************************************************
February 10, 2004
_____________________
February 3, 2003 - Pertinent Information for Homeowners
___________________________
October 31, 2002 - Memo to Owners re Board Committees
__________________________
October 1, 2002 - IMPORTANT NOTICE re Glycol & Heating Systems
Attachment - % Glycol Chart by Unit
_____________________
September 27, 2002 - Memo re Unit Access & Irrigation System Maintenance
_____________________
August 13, 2002 - Memo to Duplex Owners re Staining
____________________
May 14, 2002 - Memo to Owners re Windows & Patio Doors
_____________________
February 26, 2002 - Memo to Owners re Property Issues: Unit Access, Inspection of Windows and Doors, Parking, and Dumpster Doors
____________________
**The Wildernest Commercial Center (WCC) is located at the base of Buffalo Mountain on Wildernest Road. From Blue River Run, turn left onto Highway 9 and go to the last intersection before the I-70 on ramp. Turn right onto Wildernest Road. The Commercial Center is located on the right before the sharp right turn going up the mountain. The Conoco station will be immediately in front of you, and the Commercial Center is on the left.
This page last updated August 22, 2007